All the panels are now in place, waiting for the BeralaPatch Power Station, to be connected to the grid, and starting to produce Green Energy
One more Panel to go

The Inverter
Affixing the rails
Checking where to install the Panels

The Solar Panels

Sunday the 7th. also was a good fishing day.
The Gardener
0 Comments:
Post a Comment
<< Home